CPEC is Transforming The Least Developed Parts of Pakistan

In a New York Times Op Ed titled "How Not to Engage With Pakistan",  ex US Ambassador to Pakistan Richard G. Olson says "Its (CPEC's) magnitude and its transformation of parts of Pakistan dwarf anything the United States has ever undertaken".  Olson goes on to warn the Trump Administration that "Without Pakistani cooperation, our (US) army in Afghanistan risks becoming a beached whale".

Among the parts of Pakistan being transformed by China Pakistan Economic Corridor (CPEC) are some of the least developed regions in Balochistan and Sindh, specifically Gwadar and Thar Desert. Here is more on these regions:

Gwadar Port City:

Gwadar is booming. It's being called the next Shenzhen by some and the next Hong Kong by others as an emerging new port city in the region to rival Dubai. Land prices in Gwadar are skyrocketing, according to media reports. Gwadar Airport air traffic growth of 73% was the fastest of all airports in Pakistan where overall air traffic grew by 23% last year, according to Anna Aero publication.  A new international airport is now being built in Gwadar to handle soaring passenger and cargo traffic.

In addition to building a major seaport that will eventually handle 300-400 million tons of cargo in a year, China has built a school, sent doctors and pledged about $500 million in grants for an airport, hospital, college and badly-needed water supply infrastructure for Gwadar, according to Reuters.

400 Km Long Kachhi Canal From Punjab to Balochistan

The Chinese grants include $230 million for a new international airport in Gwadar, one of the largest such disbursements China has made abroad, according to researchers and Pakistani officials.

New development work in Gwadar is expected to create as many as 20,000 jobs for the local population.

Steel Bridges on Multan-Qila Saifullah Section of Highway N-70 Conn...

Thar Desert:

Thar, one of the least developed regions of Pakistan, is seeing unprecedented development activity in energy and infrastructure projects.  New roads, airports and buildings are being built along with coal mines and power plants as part of China-Pakistan Economic Corridor (CPEC). There are construction workers and machinery visible everywhere in the desert. Among the key beneficiaries of this boom are Thari Hindu women who are being employed by Sindh Engro Coal Mining Company (SECMC) as part of the plan to employ locals. Highlighted in recent news reports are two Hindu women in particular: Kiran Sadhwani, an engineer and Gulaban, a truck driver.

Kiran Sadhwani, a Thari Hindu Woman Engineer. Source: Express Tribune

Thar Population:

The region has a population of 1.6 million. Most of the residents are cattle herders. Majority of them are Hindus.  The area is home to 7 million cows, goats, sheep and camel. It provides more than half of the milk, meat and leather requirement of the province. Many residents live in poverty. They are vulnerable to recurring droughts.  About a quarter of them live where the coal mines are being developed, according to a report in The Wire.

Hindu Woman Truck Driver in Thar, Pakistan. Source: Reuters

Some of them are now being employed in development projects.  A recent report talked of an underground coal gasification pilot project near the town of Islamkot where "workers sourced from local communities rested their heads after long-hour shifts".

Hindu Woman Truck Driver in Thar, Pakistan. Source: Reuters 

In the first phase, Sindh Engro Coal Mining Company (SECMC) is relocating 5 villages that are located in block II.  SECMC is paying villagers for their homes and agricultural land.

SECMC’s chief executive officer, Shamsuddin Ahmed Shaikh, says his company "will construct model towns with all basic facilities including schools, healthcare, drinking water and filter plants and also allocate land for livestock grazing,” according to thethirdpole.net He says that the company is paying villagers above market prices for their land – Rs. 185,000 ($ 1,900) per acre.

Summary:

Ex US Ambassador Richard Olson is absolutely right in his assessment that "(CPEC's) magnitude and its transformation of parts of Pakistan dwarf anything the United States has ever undertaken".  Olson goes on to warn the Trump Administration that "Without Pakistani cooperation, our (US) army in Afghanistan risks becoming a beached whale". The "magnitude" of CPEC and its "transformation" that Olson refers to is clearly visible in some of the least developed regions of Pakistan in Balochistan and Sindh provinces.  Gwadar port city and Thar desert are humming with unprecedented development activity fueled by billions of dollars of funds allocated by China and Pakistan.  

Related Links:

Views: 1832

Comment by Riaz Haq on June 8, 2019 at 11:04am

Pakistan breaks ground on Gwadar Airport project

https://www.airport-technology.com/news/gwadar-airport-project/

The proposed airport, which is being funded by China, will cover an area of 4,300 acres. It will be capable of accommodating narrow-body aircraft, as well as big aircraft such as the Airbus A380.

The airport is one of numerous projects in Gwadar being financed by the Chinese government as part of its Belt and Road Initiative.

In order to finance the airport, a grant agreement between Chain and Pakistan was signed in May 2017.

“The projects in Gwadar are conducted under a framework agreement with NDRC and a MoU with MOFCOM and the Exim Bank. Unlike many of the other China Pakistan Economic Corridor (CPEC) projects in Gwadar, the New Gwadar International Airport is not financed by a loan from China but through a Chinese grant,” cpecinfo.com said in a statement.

Scheduled to become operational over the next three year, the new airport will be developed under the guidance of the Civil Aviation Authority (CAA).

Once commissioned, it will become the second largest airport in Pakistan.

Pakistan believes that the new international airport, which will operate under the open skies policy, will help Gwadar to emerge as a regional economic hub.

The soil testing on the land, which started in January last year, has been completed through 300 boreholes made on various locations.

The aviation authorities have already approved the design and work plan for the airport.


Comment by Riaz Haq on June 8, 2019 at 11:06am

Malakand Division Attracts Influx Of Tourists After Swat Expressway's Opening

https://www.urdupoint.com/en/pakistan/malakand-division-attracts-in...

SWAT, (UrduPoint / Pakistan Point News - 7th Jun, 2019 ) :All the six districts of Malakand division have witnessed massive influx of foreign and domestic tourists during week long Eid holidays following an opening of multi-faceted Swat Expressway to enjoy its pleasant and cool weather conditions.

The scenic hilly areas and tourism resorts in Malakand division including Swat, Dir Upper, Dir Lower, Chitral, Shnagla and Buner have attracted tourists in droves from plain areas of Pakistan mostly from Khyber Pakthunkhwa and Punjab provinces after the distance between Malakand division and Islamabad was cut short to only two and half hours following an opening of 81-kilometer long Swat expressway before Eidul Fitre on the directives of Chief Minister Mahmood Khan.

The four-lane fenced Swat expressway commences from Karnal Sher Interchange in Swabi district on Peshawar-Islamabad Motorway (M-I) and concludes at Chakdara in Dir Lower district after passing through 21 bridges and 1300 meters twin tunnels on National Highway N-45, inter-connecting Swat, Chitral, Dir Upper, Dir Lower, Shangla, Buner, Mohmand and Bajaur districts with rest of the country.

Former KP Chief Minister Pervez Khattak had performed the ground-breaking of Swat expressway on August 25, 2016 to provide an extra and fast track communication facilities to hundreds of thousands of travelers visiting this part of the country on daily basis.

The expressway brought massive surge in tourists at scenic Kalam, Malam Jabba, Maho Dhand, Fizagut, Maidan, Bahrain in Swat, Pir Baba in Buner, Komrat in Dir, Shangla and Chitral where finding a room in hotels, restaurants and rest houses for staying along with families was highly a challenging task these days.

Kalam has remained main centre of attraction of tourists due to its cool weather and pleasant climate where tourists from AJK, Punjab, KP and Gilgit Baltistan were seen in droves. They enjoyed waterfalls, lush green valleys, meadows, snow-covered peaks, water boating, horse and camel ridings in a very pleasant atmosphere.

Located on River Swat some 99 kilometers of Mingora Swat, Kalam's scenic areas Matiltan, Usho, Utror, Gabral and Mohodhand lake saw tourists of all social class during Eid vacations where low income groups stayed at makeshift hotels, tents and rooms of houses vacated by local people earning great profits.

"I came from Nowshera along with my friends to enjoy Eid vacations at Kalam due to its pleasant and cool weather to beat the scorching heat," Zeeshan Khan, 25, a tourist told APP. "The weather of Kalam is very pleasant and tourists can come here to enjoy its natural waterfalls, lakes and snow covered mountains peaks in a safe atmosphere," he said.

Malama Jabba, the country's lone skiing resort in Swat district has attracted influx of tourists with families enjoyed chair-lift ride.

'I came to Malam Jabba after visiting Kalam to enjoy Eid holidays in a pleasant weather," Haseeb Khan, a resident of Peshawar told APP.

"I enjoyed ride an imported chairlift at Malam Jabba as it was very comfortable, safe and tourists must come here to enjoy its natural beauty, lush green valleys and chairlift ride," he said. However, he complained over high prices being charged by private hotels, restaurants and shopkeepers that needed to be checked by the district administration and proper arrangements should be made for car parking in famous tourists' destinations to avoid traffic jams.

Haseeb said private hotels are charging Rs 6,000-10,000 per room per night stay from families at Kalam and demanded strong actions against profiteers.

------

Chairlift at Malam Jabba, which was destroyed during militancy in 2008-09, has been reconstructed and opened for tourists, adding the newly reconstructed chairlift has been imported and safe in all aspect. 

Comment by Riaz Haq on June 8, 2019 at 11:02pm

Opening of Swat Expressway facilitates people

https://www.dawn.com/news/1486990/opening-of-swat-expressway-facili...

MINGORA: The tourists visiting Malakand division showed satisfaction over temporary opening of Swat Expressway during the Eidul Fitr holidays, saying it saved their time and shortened the journey between Islamabad and Swat by about two hours.

According to the district administration, more than 60,000 vehicles used the expressway to enter Swat.

“When we heard that the expressway was opened for traffic, we immediately planned to visit Swat on the second day of Eid. The expressway till Palai interchange is complete and is under construction at several locations onwards. But it is good that temporary roads have been built for light traffic,” said Haris Iqbal, a tourist from Islamabad, who was travelling to Swat with his family.

He said that he reached Swat in three hours using the newly opened expressway. The tourists said that they enjoyed lush green scenes stretched along the expressway.

“It has not only shortened the distance between Islamabad and Swat but the route also offers enchanting scenes of lush green landscape and beautiful mountains. I invite people from all over the country to come and travel on the route to see the natural beauty of Pakistan,” said Jamila Qureshi, a tourist from Lahore.

The expressway, which was temporarily opened for Eidul Fitr holidays, would be closed to traffic after the holidays. According to FWO officials, the motorway would be officially opened by Prime Minister Imran Khan after two months.

However, people of Malakand division requested the provincial government to keep the route open for them.

Former chief minister of Khyber Pakhtunkhwa Pervez Khattak had inaugurated work on the 81-kilometre project in August 2016 and it was claimed the road would be completed by December 2017. However, the project could not be completed within the stipulated time.

Later, the PTI government claimed to open it by December 2018 and once again it could not be opened according to the schedule.

The four-lane road costing Rs40 billion starts from Colonel Sher Khan Interchange and passes through Sawabi and Mardan to reach Chakdara.

Comment by Riaz Haq on June 9, 2019 at 9:43am

$1.315b Karakoram Highway project to complete next year (2020)

https://nation.com.pk/28-Jan-2019/-1-315b-karakoram-highway-project...

The travel time from Havelian to Thakot will reduce from existing four hours to 1.5 hours after the completion of $1.315 billion Karakoram Highway (KKH) Phase-II, an early harvest project under the China-Pakistan Economic Corridor (CPEC) framework, next year.

The road infrastructure project being completed at an estimated cost of US$ 1.315 billion, is likely to be completed in the year 2020, according to official sources on Sunday.

The project is located in Khyber Pakhtunkhwa province with a total length of 118km, of which 39km is an expressway with subgrade width of 24.7m, and 79km is Class-II highway with subgrade width of 12.3m ( minimum widths of lanes are generally between 2.5 to 3.25 metres (8.2 to 10.7 ft).)

After the completion of the project, the travel time from Havelian to Thakot will be reduced from 4 to 1.5 hours.

Giving further details of the project, the sources informed that commercial contract was signed on December 22, 2015, between National Highway Authority and China Road and Bridge Corporation (CRBC).


The project includes 105 bridges among which 60 are large bridges, 42 medium and three small bridges. There are six tunnels, among which two on expressway and four on Class-II highway.

The groundbreaking ceremony was held on April 28, 2016. On the same day, the Pakistani Government and the Export-Import Bank of China signed the government to government loan agreement, and it came into force on June 24, 2016. The project formally commenced on September 1, 2016. The construction period is 42 months.

This project is to build a new road, not an up gradation of the existing road. As it is located in the mountainous area with complicated terrain, the construction work is extremely difficult. The milestones on tunnels, bridges, subgrades are all ahead of schedule. Two tranches of advance payment have been released in 2016.

Up to now, 2071 Pakistani staff have been employed on the project which has created many indirect jobs and played a positive role in the local economic development. The project also provides a great opportunity for cultivating and training a large number of engineering talents.

In terms of environmental protection, the executing company has hired a well-known local third-party environmental monitoring agency, and strictly complied with the local standard.

Comment by Riaz Haq on June 16, 2019 at 10:20am

#Engro #Energy to build 200 MW #solar in #Balochistan #Pakistan. According to the filings, the company plans to invest a total of USD 144 million (EUR 127.8m) in four farms and finance them with a combination of debt and equity at a ratio of 80:20. https://renewablesnow.com/news/engro-energy-applies-for-licence-for...

Pakistani power sector regulator NEPRA is considering to grant a generation licence to local developer Engro Energy Limited for four solar photovoltaic (PV) farms totalling 200 MW in the province of Balochistan.

NEPRA admitted on Wednesday four applications for the proposed projects, named Kuchlak-I, Kuchlak-II, Kuchlak-III and Kuchlak-IV, of 50 MW each. According to the filings, Engro Energy plans to invest a total of USD 144 million (EUR 127.8m) in the four farms and finance them with a combination of debt and equity at a ratio of 80:20.

The next step in the process is a 14-day period during which all stakeholders and interested and affected parties will comment on the generation licences.

If Engro Energy receives all necessary approvals, the Kuchlak PV farms will be constructed near the namesake town in Balochistan and commissioned in June 2020.

(USD 1.0 = EUR 0.89)

Comment by Riaz Haq on June 17, 2019 at 7:28pm

#Pakistan, #China agree to expedite work on #Sukkur-#Hyderabad 296 km long M-6 #Motorway as part of 1650 km #Peshawar #Karachi Motorway. M-6 will be 6-lanes with a design speed of 120 km/hour, 89 bridges, 15 interchanges and 243 underpasses. #CPEC https://nation.com.pk/18-Jun-2019/pakistan-china-agree-to-expedite-...

Minister for Planning, Development and Reforms Makhdum Khusro Bakhtyar and Ambassador of China Yao Jing during a meeting here on Monday agreed to expedite the work on Eastern Corridor from Sukkur to Hyderabad in BOT (Build, Operate, and Transfer) mode for its early completion.

The two dignitaries expressed satisfaction over the pace of projects under China Pakistan Economic Corridor (CPEC) framework.

The minister said that the incumbent government was committed to fast track the progress on this flagship project between Pakistan and China. He appreciated the Chinese leadership and government for expanding the scope of CPEC by including socio-economic and agriculture sector development under its platform.

The minister noted that signing of framework agreement on agriculture cooperation was a major milestone, adding that Pakistan would welcome Chinese agriculture companies to explore investment opportunities for initiation of joint ventures.

The minister apprised the Chinese ambassador that less developed areas including the merged districts of KP and Balochistan had been accorded priority in the next year’s development budget. The minister said that Gwadar Smart Port City Master Plan would be finalized soon which would chalk away out the way forward for development of the coastal city.

Various projects under CPEC framework including 300 MW Coal based power plant in Gwadar and Kohala Hydro power Station also came under discussion.

Comment by Riaz Haq on June 19, 2019 at 5:51pm

1 billion Dollar grant from China to fund social sector development projects under CPEC

http://www.cpecinfo.com/news/1-billion-dollar-grant-from-china-to-f...

After Prime Minister Imran Khan’s visit to China and the 8th Joint Cooperation Committee meeting, socioeconomic development officially became part of the portfolio of the China-Pakistan Economic Corridor (CPEC). Now, a Chinese team is set to visit Pakistan this week to discuss various social sector projects in the country, which will be funded by a $1 billion Chinese grant. A priority list is expected to be shared by the Ministry of Planning with the Chinese team, after reviewing the proposals given by the provinces.

A team of Chinese experts is scheduled to visit Pakistan this week which is expected to announce and investment of over $1 billion in various social sector development projects in the country.

According to official sources, the Chinese experts will be evaluating a number of social sector projects being proposed by all the provinces including Gilgit-Baltistan and Azad Jammu and Kashmir. The ministry of Planning and Development, has already sought the proposals from the provinces for the Chinese grant.

“The ministry has started receiving list of the projects from provinces, which will be discussed and evaluated by both the Chinese and local experts. The $1 billion investment will be a grant from China under the multi-billion dollar China Pakistan Economic Corridor (CPEC),” the sources said.

Ahead of the meeting with Chinese experts, the Ministry of Planning and Development is expected to hold a meeting with all stakeholders on Monday, February 25, to scrutinize the proposals made by provinces. A priority list of projects will later be shared with the Chinese team, which is expected to visit Pakistan from February 26.

“The Chinese team will also hold separate meetings with representatives of provinces and concerned officials to discuss the provincial priorities in the social sector. As announced earlier, the Chinese side will extend grant of over $1 billion for the selected social sector development projects,” sources said.

As CPEC progresses, Pakistan is looking to attract investment in agriculture and social sectors, diversifying away from the energy sector, in which China has already made substantial investment.

China’s Ambassador in Islamabad Yao Jing had earlier said that CPEC was a long-term project, adding that the five years of work done on CPEC, was just the start of the journey towards achieving socio-economic development in the region.

He said that China, in consultation with the Government of Pakistan, had decided to enter the next phase of CPEC which would focus on investment, joint ventures, establishment of Special Economic Zones (SEZs), engagement in the power sector as well as export-oriented cooperation. The Chinese Ambassador said that the second area of focus for cooperation in the next phase of CPEC was the social sector and the areas identified were education, health, agriculture, poverty reduction and human resources.

According to officials at the Ministry of Planning, during the last Joint Coordination Committee of CPEC held in Beijing the two countries had agreed to work for speedy implementation of initiatives in already identified six areas including agriculture, education, medical treatment, poverty alleviation, water supply and vocational training projects.

During the next 5 years, small projects will be the focus of attention under the CPEC, which include renovation of schools, innovation in hospital system, poverty reduction, model villages and supply of clean water for the public.

Comment by Riaz Haq on June 21, 2019 at 10:02pm

754-meter long Nahakki Tunnel in Mohmand opened for traffic

https://arynews.tv/en/nahakki-tunnel-mohmand-opened/

MOHMAND AGNECY: With the efforts of Pakistan Army, 745 meters long Nahakki Tunnel has been completed in Mohmand Agency, ARY News reported.

According to details, the tunnel has been opened for all kinds of traffic as well.

Locals told ARY News that after the construction of the tunnel, the traveling of five hours has been reduced to merely 2.5 hours.

People said that they were very happy with this infrastructure as it will facilitate a lot in traveling.


Earlier in June, the construction work of 81 kilometer-long Swat Motorway was completed and it was opened for small vehicles.

The motorway was built to facilitate tourists in traveling towards Kalam, Kumrat Valley and Dir. Moreover, the distance between Islamabad and Swat has shrunk to only five hours after the construction of the motorway.

Comment by Riaz Haq on June 21, 2019 at 10:04pm

Sixty percent construction of DI Khan-Hakla Motorway completed

https://arynews.tv/en/construction-di-khan-hakla-motorway-completed/

Sixty percent work on the construction of Dera Ismail Khan-Hakla Motorway has been completed, Radio Pakistan reported.

According to details, the 285-kilometer-long motorway is part of China Pakistan Economic Corridor (CPEC).

It will be completed at a cost of 129 billion rupees by December this year.

For ensuring timely completion of the project, Hakla- DI Khan Motorway has been divided in five sections.

Upon completion, the motorway will boost trade and business activities in Khyber Pakhtunkhwa and Baluchistan.

Few days earlier, Provincial Minister for Communication and Works Akbar Ayub Khan said Prime Minister Imran Khan is expected to inaugurate Swat motorway on 25th of next month.

The work on the construction of 81 kilometer-long Swat Motorway will be completed by the month of May, at a cost of 34 billion rupees.

He said motorway has been linked with Peshawar-Islamabad Motorway at Karnal Sher Khan Interchange near Swabi.

Swat Motorway will boost tourism, trade and economic activities in Malakand and Mardan divisio

Comment by Riaz Haq on June 28, 2019 at 8:19pm

#Pakistan's #Multan-#Sukkur 392 kilometers #Motorway M5 will be operational by August 2019. 6-Lane Motorway will reduce travel time between Multan and Sukkur from 6 and a half hours drive to only 3 hours and 30 minutes. #CPEC via @incpak https://www.incpak.com/info/sukkur-multan-motorway-m5/

Multan Sukkur Motorway (M5) is 392 kilometers long the work on M5 Section started in August 2016 and expected to be operational by August 2019.

The Sukkur Multan section, 392 Km essentially follows the Left Bank of River Indus from Multan onwards connects with (M4) towards the Faisalabad and Abdul Hakeem Motorway (M3) towards Lahore.


Sukkur Multan Motorway M5 is a component of the multi-phase Peshawar Karachi Motorway planned under the China Pakistan Economic Corridor (CPEC).

6 Lanes wide Motorway will reduce travel time between Multan and Sukkur from 6 and a half hours drive to only 3 hours and 30 minutes.

Once the Motorway M5 gets operational, the travel time from Lahore to Sukkur will be 6 hours and 30 minutes.

Khanewal to Abdul Hakeem section is about to be completed soon which will connect Peshawar, Islamabad, and Lahore with Multan directly.

According to some commuters, Motorway M5 is partially open for light vehicles however, officially it will be operational in August 2019.

Comment

You need to be a member of PakAlumni Worldwide: The Global Social Network to add comments!

Join PakAlumni Worldwide: The Global Social Network

Pre-Paid Legal


Twitter Feed

    follow me on Twitter

    Sponsored Links

    South Asia Investor Review
    Investor Information Blog

    Haq's Musings
    Riaz Haq's Current Affairs Blog

    Please Bookmark This Page!




    Blog Posts

    Pakistani Student Enrollment in US Universities Hits All Time High

    Pakistani student enrollment in America's institutions of higher learning rose 16% last year, outpacing the record 12% growth in the number of international students hosted by the country. This puts Pakistan among eight sources in the top 20 countries with the largest increases in US enrollment. India saw the biggest increase at 35%, followed by Ghana 32%, Bangladesh and…

    Continue

    Posted by Riaz Haq on April 1, 2024 at 5:00pm

    Agriculture, Caste, Religion and Happiness in South Asia

    Pakistan's agriculture sector GDP grew at a rate of 5.2% in the October-December 2023 quarter, according to the government figures. This is a rare bright spot in the overall national economy that showed just 1% growth during the quarter. Strong performance of the farm sector gives the much needed boost for about …