The Global Social Network
Pakistan is currently classified as a lower middle-income country, with the ambition to become a high-income country. Its policymakers now recognize that no country has transitioned from middle-income to high-income status without generating substantial electricity at affordable rates. The link between energy and prosperity has been well-established since the advent of the Industrial Revolution. The AI Revolution has further reinforced it. Can Pakistan make the transition to a high-income country by developing indigenous energy resources to minimize dependence on expensive imports amid geopolitical uncertainty?
![]() |
| Pakistan Developing Indigenous Energy Sources |
![]() |
| Electricity-Income Correlation. Source: ToddMoss Substack |
Related Links:
Haq's Musings
South Asia Investor Review
Solar Power Boom in Pakistan
Pakistan Electric Vehicle Policy
Nuclear Power in Pakistan
Global Power Shift Since the Industrial Revolution
AI Revolution in Pakistan: Multiple AI Apps Launched For Farmers
IPP Contacts Bankrupting Pakistan
Earth Day: Pakistan's Progress Toward Clean Energy
Solar & Battery Boom in Pakistan
Pakistan's Digital Public Infrastructure Transforming Lives
My Family's Contribution to Climate Action
China-Pakistan Economic Corridor
Ownership of Appliances and Vehicles in Pakistan
CPEC Transforming Pakistan
Pakistan's $20 Billion Tourism Industry Boom
Riaz Haq's YouTube Channel
PakAlumni Social Network
The World Bank Group released its October 2026 report titled Pakistan Development Update: Attaining Escape Velocity, which projects that Pakistan's per capita incomes could triple by 2050 if the country accelerates structural economic reforms. [1, 2]
Key Findings & Projections
Economic Growth: Real GDP growth reached 3.7% in FY26, up from 3.2% in FY25, with baseline growth projected at 3.8% for FY27 and 4.5% by FY31. [1, 2]
High-Growth Scenario: Faster, deeper structural reforms could lift annual economic growth above 6% (up to 6.9%), putting the country on a trajectory to triple average incomes by 2050. [1, 2]
Per Capita Reality: Real per capita growth remains low at roughly 1.6%, meaning stability alone is insufficient to rapidly lift living standards or create enough jobs. [1, 2]
Fiscal Progress: Higher tax collections and strict spending controls helped achieve a record primary fiscal surplus of 2.9% of GDP in FY26, while energy subsidies decreased from 1.1% of GDP in FY25 to 0.8% in FY26. Strong worker remittances also helped rebuild foreign exchange reserves. [1, 2, 3]
Required Reforms
The report emphasizes that moving past macroeconomic stabilization requires action across key areas: [1]
Tax System: Broadening and strengthening the national tax framework. [1]
Energy Sector: Continuing timely power tariff adjustments and reducing losses. [1]
State Footprint: Reducing state presence in the economy (such as privatization efforts like Pakistan International Airlines). [1]
Business & Finance: Improving the investment climate, trade liberalization under the National Tariff Policy, and expanding access to finance. [1]
https://thedocs.worldbank.org/en/doc/ec77c491733d5748d019a1b905ef37...
Pakistan’s Indicative Generation Capacity Expansion Plan (IGCEP) 2025–2035 envisages a substantial expansion of hydropower capacity as part of the government’s policy to reduce dependence on fossil fuels, particularly imported fuels, and increase the share of indigenous renewable resources in the national energy mix. The plan envisages around 21,400 MW of additional hydropower capacity by 2035.
https://www.thenews.pk/magazine/money-matters/1433757-a-security-in...
Diamer Basha is unquestionably a project of national strategic importance, but its successful completion will require sustained attention to financing, construction management, infrastructure relocation, power-generation equipment and transmission. The latest target of October 2030 should therefore be treated as a demanding implementation milestone rather than an assurance that every component will be fully operational on that date. The dam, powerhouses, electromechanical equipment and transmission system must progress in a coordinated manner if the country is to realise the project’s full benefits.
The challenges are formidable, but so are the potential gains. Diamer Basha is designed to address three of Pakistan’s most persistent strategic vulnerabilities simultaneously: water insecurity, energy insecurity and food security. Its 6.4 MAF of live storage will strengthen the country’s water-management capacity; its 4,500MW of installed generation will add a major source of indigenous renewable electricity; and its sediment-control function will help protect the operational life of the downstream Tarbela system.
The overriding priority should therefore be to complete the project with the least possible further delay and cost escalation, while maintaining the engineering, environmental and social standards required for a project of such magnitude. For Pakistan, Diamer Basha is not simply another hydropower & dam project. It is a long-term investment in the country’s water, food and energy security.
Comment
South Asia Investor Review
Investor Information Blog
Haq's Musings
Riaz Haq's Current Affairs Blog
Pakistan is currently classified as a lower middle-income country, with the ambition to become a high-income country. Its policymakers now recognize that no country has transitioned from middle-income to high-income status without generating substantial electricity at affordable rates. The link between energy and prosperity has been well-established since the advent of the Industrial Revolution. The AI Revolution has further reinforced it. Can Pakistan make the…
ContinuePosted by Riaz Haq on October 21, 2026 at 6:00pm — 4 Comments
With the expansion of the internet access in rural areas, several local language AI applications have recently been launched for downloads by farmers in Pakistan. These apps help with crop planning, soil sensing, personalized fertilizer recommendations, disease diagnoses, weather forecasts and market prices. A couple of these have been downloaded by half a million or more farmers in the country. Some of these apps use open source large language models (LLMs) like…
ContinuePosted by Riaz Haq on October 14, 2026 at 1:00pm — 4 Comments
© 2026 Created by Riaz Haq.
Powered by
You need to be a member of PakAlumni Worldwide: The Global Social Network to add comments!
Join PakAlumni Worldwide: The Global Social Network